7 concrete designs will meet with Architects, Designers, Decorators, Builders and/or
Homeowners to discuss the design of the concrete piece for your home or business. When the
design features have been decided, element 7 concrete designs will perform the
following procedure for manufacturing your functional architectural concrete. For countertops:
element 7 concrete designs requires 2 weeks notice prior to cabinet installation.
Once cabinets are
properly installed element 7 concrete designs will arrive onsite to fabricate
templates that will be used for building forms. Cabinets must be checked for level prior
to templating, element 7 concrete designs will check cabinets for level once
onsite. If cabinets are not level, cabinet installer must reset and level cabinets. element
7 concrete designs is not responsible for leveling and will charge for a second trip
to pay for time and fuel.
element 7 concrete
designs requires all sinks, faucets, cooktops, telescopic downdrafts and objects to
be inlaid (if provided by homeowner) to be available at time of templating. If a Farm
House sink is being used, it must be placed prior to templating by a decision maker, element
7 concrete designs will not be responsible for deciding sink arrangement.
Following templating
process element 7 concrete designs will begin manufacturing. Delivery and
installation period depends on size and complexity of project. Typically, from
manufacturing to installation is 21 - 28 days. Upon installation element 7 concrete
designs will return all faucets, cooktops, downdrafts. element 7 concrete designs
will install all undermount sinks. Faucets and topmount sinks are to be installed by a
plumber. Installation of the countertops is done prior to the backsplash installation. element
7 concrete designs will apply a final polish prior to client occupying home or
business. |